Sign In
Upload
Manuals
Brands
ABB Manuals
Battery Charger
Terra HP Generation 4 CE Ionity
ABB Terra HP Generation 4 CE Ionity Manuals
Manuals and User Guides for ABB Terra HP Generation 4 CE Ionity. We have
1
ABB Terra HP Generation 4 CE Ionity manual available for free PDF download: Installation Manual
ABB Terra HP Generation 4 CE Ionity Installation Manual (98 pages)
Brand:
ABB
| Category:
Battery Charger
| Size: 5.82 MB
Table of Contents
Table of Contents
3
1 About this Document
8
Function of this Document
8
Target Group
8
Revision History
8
Language
8
Illustrations
8
Units of Measurement
8
Typographical Conventions
8
How to Use this Document
8
General Symbols and Signal Words
9
Special Symbols for Warnings and Dangers
10
Related Documents
10
Manufacturer and Contact Data
10
Abbreviations
11
Terminology
11
Orientation Agreements
12
2 Safety
13
Liability
13
General Safety Instructions
13
Required Qualifications for the Installation Person
13
Personal Protective Equipment
14
Safety Instructions During Transport
14
Safety Instructions During Installation
14
Safety Instructions for Earthing
15
Signs on the EVSE
15
Discard the EVSE or Parts of the EVSE
16
Cyber Security
16
3 Description
18
Intended Use
18
Type Plate
18
General Description of the EVSE
19
Working Principle
19
Overview and Functions
20
Power Cabinet, Outside
20
Power Cabinet, Inside
21
AC Plate
22
DC Plate
23
Cable Glands in the Power Cabinet
24
Charge Post, Outside
24
Charge Post, Inside
25
Overview of the Cable Glands of the Charge Post
26
Electric Vehicle Site Solution Control 202 (EVSS)
26
Tilt Sensor Supply
26
EV Charge Cable, CCS 2
27
Parking Sensor
27
Options
27
Authorization to Charge
27
Payment Terminal
27
Fiscal Metering System
28
4 Pre-Installation
29
Pre-Installation Procedure (Site Planning)
29
Prepare the Site
29
Make Sure that the Floor Space for the EVSE and the Airflow Around the EVSE Is Correct
30
Prepare the Foundation
30
Prepare the Foundation - General Procedure
30
Prepare a Prefab Concrete Foundation for the Power Cabinet
30
Prepare a Metal Foundation for the Power Cabinet
31
Prepare a Prefab Concrete Foundation for the Charge Post
32
Prepare a Metal Foundationfor the Charge Post
33
Prepare a Custom Foundation for the Charge Post
33
Install the Grommet Plate for the Concrete Foundation of the Power Cabinet
34
5 Inspection and Transport
36
Transport the EVSE to the Site
36
Inspect the EVSE on Delivery
36
Do a Check on the Transport Sensors
36
Unpack the EVSE
36
Remove the Cabinet from the Pallet
37
Transport the EVSE on the Site
37
General Transport Procedure
37
Tilt the Charge Post to the Vertical Position
38
Move the Cabinet with a Forklift Truck
39
Hoist the Cabinet
39
6 Installation
41
General Installation Procedure
41
Mechanical Installation of the Power Cabinet
41
Install the Power Cabinet - General Procedure
41
Install the Cabinet on the Foundation
42
Install the Cover Plates of the Metal Foundation
42
Mechanical Installation of the Charge Post
43
Install the Charge Post - General Procedure
43
Remove the Cable Gland Plates
43
Install the Charge Post on the Foundation
44
Install the Cable Gland Plates
44
7 Electrical Installation of the Power Cabinet
45
General Procedure
45
Connect the PE Cable
46
Connect the AC Power Cables in the Power Cabinet
47
Connect the DC Power Cable in the Power Cabinet
47
Connect the AC Auxiliary Power Cable in the Power Cabinet
48
Connect the Interlock and DC Guard Cables to the Power Cabinet
49
Connect the Ethernet Cable between the Power Cabinet and the Charge Post
50
8 Electrical Installation of the Charge Post
51
General Procedure
51
Connect the PE Cable
51
Connect the DC Power Input Cables
52
Connect the AC Auxiliary Power Cable
53
Connect the Interlock and DC Guard Cable
54
Connect the Ethernet Cable to the Power Cabinet
54
Pre-Commissioning Mode
55
9 Prepare for Commissioning
56
10 Access to Parts
57
Open the Door of the Power Cabinet
57
Remove the Plinth Covers of the Power Cabinet
57
Open the DC Door
58
Remove the AC Cover
58
Close the Door of the Power Cabinet
59
Open the Door of the Charge Post
60
Remove the Plinth Covers of the Charge Post
60
Remove the Protection Plate of the Charge Post
61
Install the AC Cover
61
Close the DC Door
62
Close the Door of the Charge Post
62
11 Generic Procedures
64
Install a Cable Lug on a Wire
64
Install a Ferrule on a Wire
64
Install Insulating Heatshrink Tubing on a Wire
65
Connect a Wire that Has a Cable Lug
66
Connect a Wire that Has a Ferrule
66
12 Technical Data
67
EVSE Type
67
Parts Included in the Delivery
67
Required Tools for Installation
68
Required Parts for Installation
68
General Specifications
69
Electrical Installation Specifications
70
General Requirements
70
Requirements for Precomissioning
70
Requirements for Charge Post Auxiliary
71
DC Output Specifications
71
Current Peaks During the Start of a Charge Session (DC Output)
72
Logic Interfaces Specifications
72
Mass and Center of Gravity
72
Mass
72
Center of Gravity, Power Cabinet
72
Center of Gravity, Charge Post
73
Ambient Conditions
73
Noise Level
74
Torque Specifications
74
Dimensions
75
Power Cabinet
75
Charge Post
75
Height of User Operable Elements
76
Space Requirements
77
Power Cabinet
77
Charge Post
78
Charge Post: Exceptions for Bollards and Other Minor Fixed Obstacles
79
Distance Requirements between Power Cabinet and Charge Post
80
Foundation Specifications
81
Power Cabinet (Prefab Concrete)
81
Power Cabinet (Metal Frame)
84
Gland Plates for the Metal Foundation of the Power Cabinet
85
Charge Post (Metal Frame)
86
Charge Post (Prefab Concrete)
87
Gland Plates for the Metal Foundation of the Charge Post
89
Charge Post (Custom)
90
Overview of the Cable Conduits
91
Cable Specifications
92
AC Input Cable for the Power Cabinet
92
DC Power Installation Cables
93
PE Cable
93
AC Auxiliary Power Cables
94
Interlock and DC Guard Cables
94
Ethernet Cable between the Power Cabinet and the Charge Post
95
Electrical Connection Diagram
96
Expected Wye Input
97
13 Appendix
98
Hinweise zur Messgenauigkeit Entsprechend der Baumusterprufbescheinigung
98
Advertisement
Advertisement
Related Products
ABB Terra Mobile 44HV
ABB Terra Mobile 44HV CE
ABB 4234 600
ABB IRB 4600 - 60/2.05
ABB MicrOS 410
ABB CIRCUIT SHIELD 437P4621
ABB 4681
ABB 4011395154410
ABB 419F2441
ABB 1005001806
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL