hit counter script
GE ADT521PGFBS Installation Instructions Manual
GE ADT521PGFBS Installation Instructions Manual

GE ADT521PGFBS Installation Instructions Manual

Built-in dishwasher
Hide thumbs Also See for ADT521PGFBS:

Advertisement

Available languages

Available languages

Quick Links

GE Appliances

Installation Instructions

Built-In Dishwasher
If you have questions, call 800.GE.CARES (800.432.2737) or visit our Website at: GEAppliances.com.
In Canada, please call 1.800.561.3344 or visit www.geappliances.ca
BEFORE YOU BEGIN
Read these instructions completely and
carefully.
IMPORTANT –
ordinances.
• Note to Installer – Be sure to leave these instructions for the
consumer's and local inspector's use.
• Note to Consumer – Keep these instructions with your
Owner's Manual for future reference.
• Skill Level – Installation of this dishwasher requires
basic mechanical, electrical and plumbing skills. Proper
installation is the responsibility of the installer. Product
failure due to improper installation is not covered under
the GE Appliance Warranty. See warranty information.
• Completion Time – 1 to 3 Hours. New installations require
more time than replacement installations.
Printed in the United States
Observe all governing codes and
READ CAREFULLY.
KEEP THESE INSTRUCTIONS.
IMPORTANT –
to allow for future removal from the enclosure if service is
required.
Care should be exercised when the appliance is installed or
removed, to reduce the likelihood of damage to the power
supply cord.
If you received a damaged dishwasher, you should immediately
contact your dealer or builder.
Optional Accessories – See the Owner's Manual for available
custom panel kits.
FOR YOUR SAFETY
Read and observe all CAUTIONS and WARNINGS shown
throughout these instructions. While performing
installations described in this booklet, gloves, safety glasses
or goggles should be worn.
The dishwasher MUST be installed
31-31506-3 04-13 GE

Advertisement

Table of Contents
loading

Summary of Contents for GE ADT521PGFBS

  • Page 1: Installation Instructions

    GE Appliances Installation Instructions Built-In Dishwasher If you have questions, call 800.GE.CARES (800.432.2737) or visit our Website at: GEAppliances.com. In Canada, please call 1.800.561.3344 or visit www.geappliances.ca BEFORE YOU BEGIN IMPORTANT – The dishwasher MUST be installed to allow for future removal from the enclosure if service is Read these instructions completely and required.
  • Page 2: Installation Preparation

    • Hand shut-off valve (recommended) • Water line–3/8" minimum, copper tubing or Optional Hose Clamps Strain Relief GE Part # WX28X326, flexible braided hose 12' Drain Hose Air Gap GPF12L • GPF12L drain hose (12' long), if needed TOOLS YOU WILL NEED: Level •...
  • Page 3: Prepare Dishwasher Enclosure

    Installation Preparation PREPARE DISHWASHER ENCLOSURE WARNING: installer must ensure that the dishwasher is completely enclosed at the time of installation. ADVERTENCIA: This Wall Area must be Free Para reducir el riesgo de descarga eléctrica, incendio o lesiones a of Pipes or personas, el instalador debe asegurarse de que el lavaplatos esté...
  • Page 4: Prepare Electrical Wiring

    Installation Preparation PREPARE ELECTRICAL WIRING Alternate Receptacle WARNING: Location FOR PERSONAL SAFETY: Remove house fuse or open circuit breaker 18" before beginning installation. Do not use an extension cord or 1-1/2" Dia. Hole (Max.) Receptacle adapter plug with this appliance. Location 18"...
  • Page 5: Water Line Connection

    Installation Preparation PREPARE HOT WATER LINE CAUTION: NOTE: GE recommends copper tubing for the water line, but if Do not remove wood base until you are ready to install the WX28X326 dishwasher. The dishwasher will tip over when the door is braided hose.
  • Page 6: Dishwasher Installation

    Dishwasher Installation STEP 1: PREPARATION STEP 3: REMOVE WOOD BASE, INSTALL LEVELING LEGS Locate the items in the installation package: • Screws IMPORTANT – • Junction box cover • Drain hose and clamp Damage will occur. • Mounting brackets • Move the dishwasher close to the installation location and lay •...
  • Page 7: Step 6: Install 90° Elbow

    Dishwasher Installation STEP 6: INSTALL 90° ELBOW STEP 8: POSITION WATER LINE AND HOUSE WIRING • Thread 90° elbow Front of Dishwasher onto the water valve. • Position water supply line and house wiring on the floor of Use thread seal tape Water Valve the opening to avoid interference with base of dishwasher for elbows with 3/8"...
  • Page 8: Step 10: Slide Dishwasher Three-Fourths Of The Way Into Cabinet

    Bend and break Screw here if necessary Figure P If you would like to order the Trim Kit from GE Service, please call 800.GE.Cares and request part number WD08X10094 for BB models or WD08X10096 for WW or CC models. Bracket...
  • Page 9: Step 13: Push Dishwasher Into Final Position

    Dishwasher Installation STEP 13: PUSH DISHWASHER INTO STEP 14: LEVEL DISHWASHER FINAL POSITION IMPORTANT – Dishwasher must be level for proper • Check the tub insulation blanket, if equipped, to be sure it is dish rack operation, wash performance and door operation. smoothly wrapped around the tub.
  • Page 10 Dishwasher Installation STEP 16: CONNECT WATER SUPPLY STEP 15: POSITION DISHWASHER, SECURE TO COUNTERTOP OR CABINET Connect water supply line to 90° elbow. If using a flexible braided hose connection: In this step you will need the 2 Phillips special head screws •...
  • Page 11: Step 18: Connect Power Supply

    Dishwasher Installation STEP 17: CONNECT DRAIN LINE (Cont.) STEP 18: CONNECT POWER SUPPLY If a power cord with plug is already installed proceed to • Connect drain line to air gap, waste tee or disposer Step 19. using the previously determined method. Secure hose with a screw-type clamp.
  • Page 12: Step 19: Pretest Checklist

    Dishwasher Installation STEP 19: PRETEST CHECKLIST STEP 20: DISHWASHER WET TEST Review this list after installing your dishwasher to avoid • Turn on power supply or plug power cord into outlet, charges for a service call that is not covered by your if equipped.
  • Page 13: Step 22: Replace Toekick

    Dishwasher Installation STEP 21: POSITION SOUND BARRIER STEP 22: REPLACE TOEKICK AND INSULATION • Place toekick against the legs of the dishwasher. (on some models) Skip this step if the sound barrier is not assembled to the dishwasher. • Locate the sound insulation package inside the dishwasher. •...
  • Page 14 Notes...
  • Page 15 Notes...
  • Page 16 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE GE Appliances General Electric Company Louisville, Kentucky 40225 GEAppliances.com © 2013 General Electric Company...
  • Page 17: Directives D'installation

    à une installation inadéquate n’est pas couverte par la (ATTENTION et AVERTISSEMENT) données dans les présentes garantie de GE. Reportez-vous à la garantie du produit. directives. Pour effectuer l’installation décrite dans les • Durée de l’installation – Entre 1 et 3 heures. L’installation présentes directives, il faut porter des gants et des lunettes...
  • Page 18: Préparation Pour L'installation

    • Conduite d’alimentation en eau – tuyau en cuivre d’au moins Bague anti-traction facultatif GPF12L 9,5 mm (3/8 po) ou un boyau flexible tressé no WX18X326 de GE de 3.66 m (12 pi) Coupure • Boyau de vidange GPF12L (3.66 m/12 pi de long), si nécessaire anti-refoulement OUTILS NÉCESSAIRES:...
  • Page 19: Préparation Des Armoires

    Préparation pour l’installation PRÉPARATION DE L’OUVERTURE DANS AVERTISSEMENT: LES ARMOIRES Pour réduire les risques de choc électrique, d’incendie ou de blessures, l’installateur doit s’assurer que le lave-vaisselle est complètement encastré au moment de l’installation. • Le lave-vaisselle doit être installé de façon à ce que le boyau de vidange mesure au maximum 3.66 mètres (12 pieds) pour assurer une vidange adéquate.
  • Page 20 Préparation pour l’installation PRÉPARATION DU CÂBLAGE ÉLECTRIQUE Autre emplacement possible pour la AVERTISSEMENT: prise de courant POUR VOTRE SÉCURITÉ PERSONNELLE: Enlevez le fusible ou 46 cm (18 po) déclenchez le disjoncteur au panneau de distribution principal Trou de 3,8 cm avant de commencer l’installation.
  • Page 21: Préparation De L'alimentation En Eau Chaude

    • Si vous utilisez un boyau flexible tressé, étiquetez le boyau et indiquez la date d’installation à des fins de référence. Les REMARQUE: GE recommande l’utilisation d’un tuyau en cuivre boyaux flexibles tressés doivent être remplacés dans 5 ans. pour la conduite d’alimentation en eau, mais vous pouvez choi- •...
  • Page 22: Installation Du Lave-Vaisselle

    Installation du lave-vaisselle ÉTAPE 1: PRÉPARATION ÉTAPE 3: ENLÈVEMENT DE LA BASE DE BOIS, INSTALLATION DES PIEDS Prenez les pièces fournies dans l’emballage et mettez-les de côté: • Ensemble de vis DE NIVELLEMENT • Couvercle de la boîte de jonction •...
  • Page 23 Installation du lave-vaisselle ÉTAPE 5: INSTALLATION DU MATÉRIAU ÉTAPE 8: POSITIONNEMENT DE LA CONDUITE D’EAU ET DE INSONORISANT (sur certains modèles) L’ALIMENTATION ÉLECTRIQUE Passez à l'étape suivant si le lave-vaisselle n'est • Positionnez la conduite d’alimentation en eau et le câblage de la pas équipé...
  • Page 24: Étape 12: Installation Des Supports De Montage

    échéant no° 8 Si vous souhaitez commander l'ensemble de moulures du Service GE, veuillez composer le 1.800.561.3344 et demander le numéro de pièce WD08X10094 pour les modèles BB, ou le no WD08X10096 pour les modèles WW ou CC. Support...
  • Page 25 Installation du lave-vaisselle ÉTAPE 13: INSTLLATION DU LAVE-VAISSELLE ÉTAPE 14: MISE DE NIVEAU DU DANS SON EMPLACEMENT LAVE-VAISSELLE DÉFINITIF IMPORTANT – Le lave-vaisselle doit être de niveau • Vérifiez l’isolant de la cuve, s’il y a lieu, pour vous assurer pour assurer le bon fonctionnement des paniers et de la porte qu’il enveloppe complètement la cuve.
  • Page 26: Étape 16: Raccordement De L'alimentation En Eau

    Installation du lave-vaisselle ÉTAPE 15: FIXATION DU LAVE-VAISSELLE AU- ÉTAPE 16: RACCORDEMENT DE L’ALIMENTATION EN EAU DESSOUS DU COMPTOIR OU AUX CÔTÉS DES ARMOIRES Raccordez la conduite d’alimentation en eau au coude de 90°. Au cours de cette étape, vous aurez besoin des deux vis à tête Si vous décidez de faire le raccordement avec un boyau spéciale Phillips mises de côté...
  • Page 27 Installation du lave-vaisselle ÉTAPE 17: RACCORDEMENT DU BOYAU • Branchez le boyau de vidange à la coupure anti- refoulement, au raccord en T ou au broyeur à déchets DE VIDANGE à l’aide de la méthode choisie précédemment. Fixez L’extrémité moulée du boyau de vidange est conçue pour s’installer solidement le boyau à...
  • Page 28: Étape 18: Branchement De L'alimentation Électrique

    Installation du lave-vaisselle ÉTAPE 18: BRANCHEMENT DE ÉTAPE 19: LISTE DE CONTRÔLE L’ALIMENTATION ÉLECTRIQUE PRÉLIMINAIRE Si un cordon d’alimentation pourvu d’une fiche est déjà Passez en revue cette liste après l’installation de votre installé sur l’appareil, passez à l’étape 19. lave-vaisselle pour éviter des frais de réparation inutiles non couverts par votre garantie.
  • Page 29 Installation du lave-vaisselle ÉTAPE 20: ESSAI DU LAVE-VAISSELLE ÉTAPE 21 : INSTALLATION DU MATÉRIAU AVEC DE L’EAU INSONORISANT ET DU MATÉRIAU ISOLANT (sur certains modèles) • Rétablissez l’alimentation électrique ou si l’appareil est doté d’un cordon d’alimentation, branchez-le dans la prise de Passez à...
  • Page 30 Installation du lave-vaisselle ÉTAPE 22: RÉINSTALLATION DU PANNEAU INFÉRIEUR • Appuyez le panneau inférieur contre les pieds de nivellement du lave-vaisselle. Vis de fixation Figure CC • Alignez le panneau inférieur par rapport au bas de la porte et assurez-vous qu’il repose sur le plancher. Le panneau inférieur doit demeurer en contact avec le plancher.
  • Page 31 Notes...
  • Page 32 LES SPÉCIFICATIONS PEUVENT ÊTRE MODIFIÉES SANS PRÉAVIS GE Appliances General Electric Company Louisville, Kentucky 40225 www.electromenagersge.ca © 2013 General Electric Company...

This manual is also suitable for:

Adt521pgfwsGdf520psfss

Table of Contents