hit counter script
Download Print this page
Epson BrightLink 450Wi Using

Epson BrightLink 450Wi Using

Using the wall-mounting cable management kit
Hide thumbs Also See for BrightLink 450Wi:

Advertisement

Available languages

Available languages

Using the Wall-Mounting Cable Management Kit
Follow these instructions to install the cable management channels on your wall and place the cables in the
channels.
The Wall-Mounting Cable Management Kit includes the parts shown below:
18-inch-long channel
(1 piece)
1
Plan your cable management layout, referring to the illustration below. If you want to connect two 4-foot
channels together (end-to-end), use a seam cover where the channels meet. Use the small connector pieces
to turn corners. Use a hacksaw to cut the channels and channel covers to desired lengths.
Tip
When using a hacksaw, cut the plastic slowly to maintain smooth edges.
Note
The example shown below is for a typical installation, but yours may vary. For example, if the computer is on the right
side of the screen, you should attach the channels to the wall on the right side instead of the left.
Seam
cover
4-foot-long channels
(4 pieces)
Corner connector
(3 pieces)
Drywall screws
(100 pieces)
Seam cover
(10 pieces)
Corner
connector

Advertisement

loading

Summary of Contents for Epson BrightLink 450Wi

  • Page 1 Using the Wall-Mounting Cable Management Kit Follow these instructions to install the cable management channels on your wall and place the cables in the channels. The Wall-Mounting Cable Management Kit includes the parts shown below: 4-foot-long channels (4 pieces) Drywall screws (100 pieces) 18-inch-long channel Seam cover...
  • Page 2 Remove the channel covers, then attach the channels and connector pieces to your wall using the adhesive backing. To orient the parts correctly, note the following: • When connecting two channels together, you need to make sure the tracks inside the channels line up where the pieces meet.
  • Page 3 Utilisation de l’ensemble de gestion des câbles pour montage mural Suivez les instructions suivantes pour installer les voies de gestion des câbles sur votre mur et pour placer les câbles dans les voies. L’ensemble de gestion des câbles pour montage mural inclut les pièces illustrées ci-dessous : Voies de 4 pieds de long (4 pièces) Vis de cloison sèche (100 pièces)
  • Page 4 Retirez les couvre-voie et ensuite installez les voies et les pièces de raccordement à votre mur en utilisant le renforcement adhésif. Pour que les pièces soient orientées correctement, prenez note des éléments suivants : • Lorsque vous raccordez deux voies ensemble, vous devez vous assurer que les rails à l’intérieur des voies s’alignent à...