LG SPLIT COMPACT DEDICATED OUTDOOR AIR SYSTEM (DOAS) INSTALLATION MANUAL Variable Refrigerant Flow Split Compact DOAS ARND***DCR4 Series (900, 1,500 and 2,000 CFM)
2. Rotate the fan wheel(s) by hand to ensure parts are not in contact with one another and are causing friction / damage. Assemblies • Blower - One plenum-type fans (LG 3D Plug). All units are equipped with a plenum fan for supply air. • Coils - Evaporator Coil and Reheat Coil.
Wrap all refrigerant piping including field-provided isolation ball valves and flexible pipe connection kits provided by LG. Glue all insulation joints with no air gaps between insulation segments, and between insulation segments and the unit case. Ensure insulation material fits snugly against the refrigeration pipe with no air space between the pipe surface and the surrounding insulation.
Be sure no traps or sags are present. • LG prefers the use of hard drawn copper in pipe segments connecting a Dedicated Outdoor Air System (DOAS) product and an outdoor unit. which can result in injury or death.
ELECTRICAL INFORMATION Communication Cable Specifications From Outdoor Unit to DOAS Units • Communication cable from Main Outdoor Unit to DOAS Units is to be LG supplied or field supplied 18 AWG, 2 (2 conductor), twisted, stranded, shielded. Never splice communications cable. Ensure the communication cable shield is properly grounded to the Main Outdoor Unit chassis only.
Do not apply power to the units before performing a system leak test. There is a possibility that the EEV valves will close and isolate sections of the piping system, making the leak test inconclusive. Contact your LG Applied Rep or service technician for the procedure to reopen the EEV valves before the leak test ONLY if the power has been applied.
Do not open the outdoor unit service valves and release the factory refrigerant charge until the LG trained commissioner authorizes to do so. The system must be left in vacuum until the LG trained commissioner verifies the quality of the evacuation.
Step 2: Location Selection (Remote Mounted Installations Only). If the electric preheater is to be installed in a remote location where it is not directly connected to the LG Compact DOAS unit, choose a location that conforms to the following: •...
Page 57
Rear access is required to install the connecting screws. Connect the Compact DOAS unit to the Electric Preheater before connecting ductwork to the Electric Preheater inlet. 1. Remove the MERV 8 filters from the LG Split Compact DOAS and use them within the electric preheater. NOTE Figure 42: Removing the MERV Filters.
DOAS Unit Address Settings LG DOAS can be connected up to a maximum of four (4) units on a Multi V 5 heat recovery outdoor unit system. If more than two (2) DOAS units are installed, the DOAS / heat recovery unit (integral part of the Split Compact DOAS) addresses must match. Factory set value is 0.
Page 88
Who to Call for Assistance Freight Damage and Unit Replacements Your LG Manufacturer Representative Missing Parts Your LG Manufacturer Representative Freight Damage and Unit Replacements Your LG Manufacturer Representative Wrong Unit Model Your LG Manufacturer Representative Installation, Startup, and Commissioning Technical Assis-...