Page 18
Tube wall thickness should meet local code requirements and be approved for an operating pressure of 551 psi. If local code does not specify wall thickness, LG suggests using tube thickness per table below. When bending tubing, try to keep the number of bends to a minimum, and use the largest radii possible to reduce the equivalent length of installed pipe;...
Page 19
Only LG supplied Y-branch and Header fittings (as referenced below; sold separately) can be used to join one pipe segment to two or more segments. Third-party or field-fabricated Tee’s, Y-fittings, Headers, or other branch fittings are not qualified for use with LG Multi V Space II systems.
Page 24
Isolation Ball Valves LG allows the installation of field-supplied ball valves with Schrader ports at each indoor unit. Full-port isolation ball valves with Schrader ports (positioned between valve and indoor unit) rated for use with R410A refrigerant should be used on both the liquid and vapor lines.
Page 42
Pipe sleeves at Penetrations LG requires that all pipe penetrations through walls, floors, and pipes buried underground be properly insulated and routed through an appropriate wall sleeve of sufficient size to prevent compression of refrigerant pipe insulation and free movement of the pipe within the sleeve.
Insulation to y-Branch and Header fittings Check the fit of the insulation jacket provided with the LG Y-branch and Header kits after all pipes are brazed to fittings. Mark all pipes at the point where the insulation jacket ends. Remove the jacket. Install field-supplied insulation on the pipe segments first, and then install the LG provided insulation plugs on the ends of all unused Header ports.
Page 56
Can be assigned at will or for example, can follow the room layout on each floor. For each LG Central Controller product provided on the project, devise a central control address schedule and assign a central control address to each indoor unit(s) Hydro Kit(s), and ERV(s) units. Record this central control address for each component in the column provided on the Pre-commissioning Device Configuration Worksheet.
Page 60
CN inverter socket on the Space II unit noise filter PCB.) For detailed information on how to troubleshoot each error, see the Space II Unit Service Manual on www.lg-vrf.com. Due to our policy of continuous product innovation, some specifications may change without notification.
Page 61
Space II unit fan is experiencing first position sensor failure. For detailed information on how to troubleshoot each error, see the Space II Unit Service Manual on www.lg-vrf.com. Due to our policy of continuous product innovation, some specifications may change without notification.
No “Star” or multiple parallel circuits. No cable splices or wire caps were used to connect communications cables. LG-supplied cable was used between each indoor unit and its zone controller. No cables were spliced and no wire caps are present.
Page 68
Date: _______________________________________________ *This form must be completed and submitted to LG a minimum of three (3) weeks prior to final scheduling of any startup. Note: If any of the above items are not complete at time of start-up, back charges will be assessed for additional costs.
Page 75
For further technical materials such as submittals, engineering manuals, service manuals, and catalogs, visit www.lg-vrf.com.
Page 76
20001747 ISO 9001: 2008 LG ELECTRONICS INC. LG Electronics LG Customer Information Center, Commercial Products Commercial Air Conditioning Division 1-888-865-3026 USA 11405 Old Roswell Road Follow the prompts for commercial A/C products. Alpharetta, Georgia 30009 www.lg-vrf.com VRF-IM-BS-001-US 014B14...